The long roof frame of the replacement store, a continuous 13-metre span
duoKore® scheme

Store

A rapid response to bad weather: drawings the next day, first frames in place within 48 hours, and the frame erected in six hours.

The scheme

The images below demonstrate a rapid response to an issue that arose from bad weather. The frame is being erected on a base that was for a greenhouse. The greenhouse was used to store equipment that could not be left exposed to the outdoor elements. After a storm, a tree crashed onto the greenhouse, obliterating it. The very next day, our architects and engineers completed the drawings for the replacement. Within 48 hours the first frames were in place, and in total it took six hours to erect the frame.

48 hours Until the first frames were in place
6 hours To erect the whole frame
13 m Continuous roof frame span

More duoKore® schemes

All duoKore® schemes
Build with us

Builders and developers can take duoKore® into their own region through the Green 4 Master partner network.

Partner with us Talk about a scheme